
Bodywork continuing to taking shape.
|

Rear bodywork under construction. |

Vehicle power and air pressure
service
panel nearing completion.
|

Vehicle power and air pressure service
panel hinged and
secured.
|

Pilot and main parachute tubes
mounted.
|

Different length tubes for high speed
and low speed parachutes.
|

Trial fitment of engine air intake
naca duct. |

Rear wheel service panel in trail
fitment.
|

Service panel for transmission air
shift bottle and cooling system.
|

Breathing air tank, regulator and
hose installed along with gear
shift bottle. |

Carbon fibre panel made in house
for MoTeC components. |

MoTeC ADL dash logger also
received a carbon fibre mount.
|

Cockpit control panel taking
shape.
|

Air speed meter and fire system
controls installed.
|

High speed and low speed
parachute leavers installed |

Underbody panels taking shape.
|

Left hand side cockpit view |

Rear shock absorber pivots
completed.
|

Shock absorber pivots ready for
painting.
|

Rear suspension pan-hard rod
and ladder bars nearing completion. |