Build Diary

Date: September 17, 2009


Bodywork continuing to taking shape.

Rear bodywork under construction.

Vehicle power and air pressure
service panel nearing completion.

Vehicle power and air pressure service
panel hinged and secured.

Pilot and main parachute tubes
mounted.

Different length tubes for high speed
and low speed parachutes.

Trial fitment of engine air intake
naca duct.

Rear wheel service panel in trail
fitment.

Service panel for transmission air
shift bottle and cooling system.


Breathing air tank, regulator and
hose installed along with gear
shift bottle.

Carbon fibre panel made in house
for MoTeC components.

MoTeC ADL dash logger also
received a carbon fibre mount.

Cockpit control panel taking
shape.

Air speed meter and fire system
controls installed.


High speed and low speed
parachute leavers installed

Underbody panels taking shape.

Left hand side cockpit view


Rear shock absorber pivots
completed.

Shock absorber pivots ready for
painting.

Rear suspension pan-hard rod
and ladder bars nearing completion.

Date: July 27, 2009



Engine air intake scoop nearing
completion.



Rear wheel access panels under construction.



Rear body panels under
construction.



Rear body panels under
construction 2.



Body side panel in the build.
Vehicle lifting cross bar nearing
completion.



Nose cone nearing completion.




Lower body panel mould with fresh
panel ready for second layer of
fibreglass.



Lower body panels ready for
trimming and fitment
.

Date: June 19, 2009



Canopy nearing completion.



Canopy windscreen frames in place.


Canopy nearing completion.



Canopy and roll body panels trial
fitted.



Body access hatch fasteners secured
in place.



Looking more like a fighter jet every
day.



Not much room in there.



Pretty dark in there without the flash
.


Yes, Trevor is in there somewhere.


You wouldn't want to be claustrophobic.



Trevor standing at ground level
showing how low to the ground the
streamliner is. 980mm or 38.5inchs
from the ground to where Trevor's
hand is.



Nose cone fresh off the plug.

 


Nose cone roughly positioned.


Gearbox body panel cover nearing completion.

Rear wheel access panel in trial
fitment.

Rear shock absorber pivot mounts
installed.

Rear shock absorber pivot.

Top view of shock mount system.

Rear axles and hud assemble
completed.

Rear brake calipers installed.


Date: May 31, 2009




Canopy cap and windscreen
dummy fitment.




All fibreglass panels produced
inhouse by Trevor.



It's amazing what a few body
panels has done to the build.



Canopy looking fast just sitting
there.




Access hatches holes completed
ready for fasteners.



Top fibreglass body panels joined.




Canopy section trimmed to
shape.




Engine air intake scope in dummy
position
.


Engine air intake scope will be
fibreglassed into engine cover
.


Engine air intake scope in dummy
position
.



Engine cover & rear body panel
mould frame
.


Rear air foil completed
.



Front suspension travel limiting
strap
.

 

Date: May 12, 2009




Top fibreglass body panels taking
shape.




Fibreglass panels produced
inhouse by Trevor.



Recessed access hatch's for front
suspension, battery and pedal
controls.



Once completed the two top
panels will be fibreglassed
together.




Canopy panels taking shape.

 




An aluminum canopy cap is being
shaped. This will be used to create
a mould for the canopy cap.




Brake bias value control fitted next
to
brake fluid reservoir.




Rear air foil ready for final

assembly.


One of the onboard camera mounts
atop of the rear air foil.
 

Date: Jan 6, 2009



Hypertune inlet manifold test
fitted.




Dual Hypertune fuel rails running 12
Indy Blue injectors plumbed thanks
to SpeedFlow.


Engine breather tank nearing
completion.



Hypertune manifold plenum test
mounted. Lower fuel rail mounting
brackets awaiting re-location.


Hypertune manifold plenum test
mounted.


Rear air foil under construction.


Canopy templates near completion.



Custom NPC Triple plate clutch
assembly.


Custom NPC Triple plate clutch
components.


Custom NPC Triple plate clutch
installed.

Date: Dec 20, 2008



Left hand fuel tank ready for
mounting.



Dual Turbosmart fuel pressure
regulators mounted.


Right hand fuel tank ready for
mounting.


SpeedFlow handles all the fuel, oil
and cooling plumbing.


Left hand cooling system tank
mounts.


Left hand cooling system tank
mounted and plumbed.


Cooling system pump mounted
ready for wiring.


Radiator received a coat of matt black
to help dissipate the heat.


Right hand cooling system tank
mounted and plumbed.


Helmet hans device straps mounted through behind head rest.


Front brakes plumbed thanks to
SpeedFlow.


Radio communication system mounted.


Trevor, deep in thought .....



Date:
Nov 20, 2008




Front suspension painted and
fully assembled.


Front brakes in final stages of
assemble.



Engine oil pump mounted and
aligned.



Engine oil line plumbing to dry sump
tank etc completed.